Skip to main content
Comptroller Main Webpage

The Clerk of the Board is responsible for keeping accurate minutes and maintaining Board records for each Board of County Commissioner (BCC) and Value Adjustment Board (VAB) meeting. In addition, every 4 years, the Clerk of the Board office provides staff support to the Charter Review Commission (CRC) appointed by the BCC. Please contact our office if you need an accessible version of documents on this page, and one will be provided.

Selection options are described below:

1. To search BCC records by meeting date and/or a specific term between September 23, 1869 and December 14, 2010, view the 'BCC Meetings' page.

2. To view BCC records by meeting date between January 4, 2011 through September 22, 2016, scroll down to locate the BCC meeting date.

3.
To search BCC records by a specific term between October 4, 2016 through Present, select the 'Search Records' tab.      

4.    To view VAB records by meeting date between June 20, 2013 through August 21, 2018, scroll down to locate the VAB meeting date. 

5.    To search CRC regular business meeting records by a specific term between February 25, 2019 through Present, select the 'Search Records' tab.

File #: 25-1486    Version: 1 Name:
Type: Recommendation Status: Consent Agenda
File created: 10/30/2025 In control: Public Works Department
On agenda: 11/18/2025 Final action:
Title: Approval and execution of (1) Resolution of the Orange County Board of County Commissioners regarding the Local Agency Program Supplemental Agreement No. 1 with the State of Florida Department of Transportation concerning Tiny Road Intersection Improvements Project; and providing for an effective date. (FPN 444788-1-58/68-01) and (2) State of Florida Department of Transportation Local Agency Program Supplemental Agreement Supplemental No. 1 Contract No. G3068 FPN: 444788-1-58/68-01 in the amount of $189,070, for a revised total of $714,603. District 1. (Transportation Planning Division)
Attachments: 1. 11.18.2025_25-1486_ Resolution_Tiny_Road-Amend 1, 2. 11.18.2025_25-1486_444788-1-58-01 (G3068) SA #1 (007)_REVISED
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Interoffice Memorandum

 

DATE: October 30, 2025

 

TO: Mayor Jerry L. Demings and County Commissioners

 

THROUGH: N/A

 

FROM: Joseph C. Kunkel, P.E., Director, Public Works Department

 

CONTACT: Brian Sanders, Manager

 

PHONE: (407) 836-8022

 

DIVISION: Transportation Planning Division

 

ACTION REQUESTED:

title

Approval and execution of (1) Resolution of the Orange County Board of County Commissioners regarding the Local Agency Program Supplemental Agreement No. 1 with the State of Florida Department of Transportation concerning Tiny Road Intersection Improvements Project; and providing for an effective date. (FPN 444788-1-58/68-01) and (2) State of Florida Department of Transportation Local Agency Program Supplemental Agreement Supplemental No. 1 Contract No. G3068 FPN: 444788-1-58/68-01 in the amount of $189,070, for a revised total of $714,603. District 1. (Transportation Planning Division)

body


PROJECT:
N/A

 

PURPOSE:
Public Works Department staff has solicited construction services for the intersection of Tiny Road at Tilden Road. The project will improve the intersection of Tiny Road and Tilden Road by replacing the current three-way stop with a new traffic signal and widening both roads from two to three lanes within the project limits. Work includes milling and resurfacing, adding curb and gutter, installing new and replacement sidewalks with ADA-compliant ramps, and upgrading pedestrian features. Signal improvements will provide modern technology such as CCTV cameras, vehicle and pedestrian detection, illuminated signs, and a mast arm assembly. Additional enhancements include thermoplastic striping, roadway signage, and drainage improvements with swales, a new wet detention pond, and supporting structures to improve stormwater management. The project length is 0.53 miles. 

This project is funded in accordance with the Local Agency Program (LAP) Agreement approved by the Board on March 5, 2024. The Florida Department of Transportation has reduced the federal funding amount from $4,032,583 to $3,843,513 for construction and engineering inspection. This reduction is due to: Non-Federal Aid Participating items, a federal funding cap toward the proposed steel mast arm, and reduction in the CEI services. This reduction will increase the County’s construction and CEI share by $189,070 to a total of $714,603.  

The County Attorney’s Office, Risk Management Division, Public Works Engineering Division, and Transportation Planning Division have reviewed this Resolution and Supplemental Agreement and find them acceptable.  

 

BUDGET: N/A