The Clerk of the Board is responsible for keeping accurate minutes and maintaining Board records for each Board of County Commissioner (BCC) and Value Adjustment Board (VAB) meeting. In addition, every 4 years, the Clerk of the Board office provides staff support to the Charter Review Commission (CRC) appointed by the BCC. Please contact our office if you need an accessible version of documents on this page, and one will be provided.

Selection options are described below:

1. To search BCC records by meeting date and/or a specific term between September 23, 1869 and December 14, 2010, view the 'BCC Meetings' page.

2. To view BCC records by meeting date between January 4, 2011 through September 22, 2016, scroll down to locate the BCC meeting date.

3.
To search BCC records by a specific term between October 4, 2016 through Present, select the 'Search Records' tab.      

4.    To view VAB records by meeting date between June 20, 2013 through August 21, 2018, scroll down to locate the VAB meeting date. 

5.    To search CRC regular business meeting records by a specific term between February 25, 2019 through Present, select the 'Search Records' tab.

File #: 24-1602    Version: 1 Name:
Type: Procurement Status: Passed
File created: 10/22/2024 In control: Administrative Services Department
On agenda: 11/19/2024 Final action: 11/19/2024
Title: Approval of Amendment No. 3, Contract Y17-811, Southwest Service Area Potable Water Storage and Repump Facility (SWSA SRF), with Hazen and Sawyer, P.C., in the amount of $375,507.18, for a revised contract amount of $1,524,781.70. ([Utilities Department Engineering Division] Procurement Division)

Interoffice Memorandum

 

DATE: October 22, 2024

 

TO: Mayor Jerry L. Demings and County Commissioners

 

FROM: Carrie Mathes, CFCM, NIGP-CPP, CPPO, C.P.M., Manager II, Procurement Division

 

CONTACT: Lindy A. Wolfe, P.E. LEED AP, Manager II, Utilities Engineering Division

 

PHONE: 407-254-9918

 

SUBJECT: Amendment No. 3, Contract Y17-811 Southwest Service Area Potable Water Storage and Repump Facility (SWSA SRF)

 

ACTION REQUESTED:

title

Approval of Amendment No. 3, Contract Y17-811, Southwest Service Area Potable Water Storage and Repump Facility (SWSA SRF), with Hazen and Sawyer, P.C., in the amount of $375,507.18, for a revised contract amount of $1,524,781.70. ([Utilities Department Engineering Division] Procurement Division)

body


PROCUREMENT:

This amendment adds funds to support additional construction administration services due to unforeseen conditions caused by 25 months of construction delays, mainly from material and resource shortages, delivery issues, wet weather, private development construction conflicts, and failed inspections later requiring consultant reinspection. Extra efforts are needed for responding to addendum items, reviewing supplementary shop drawings, and managing these delays. This amendment covers additional construction administration engineering services beyond the original scope of the SWSA SRF project to account for the extended construction duration. The amendment also added 720 days to the project timeframe.

FUNDING:

Funding is available in account number 4420-038-1506-0030-6340.

APPROVALS:

The Utilities Engineering Division concurs with this recommendation.

REMARKS:

This amendment provides for additional engineering services required by the County for the SWSA SRF. The additional services are required for Hazen and Sawyer, P.C. to continue the construction administration services for the extended project construction phase. The construction administration services include:

                     Additional meetings

                     Additional site visits and inspections

                     Additional shop drawings, submittals, requests for information (RFIs), and coordination

                     Additional certifications of completion

                     Additional preparation of Record Drawings

                     Installation assistance of communication system for Fire department

                     Building modifications

On August 22, 2017, the Board approved the selection of Hazen and Sawyer, P.C.  Contract Y17-811, resulting in a negotiated contract in the not-to-exceed amount of $749,891.95, encompassing engineering and support services related to preliminary engineering, design, bidding, and construction administration for the SWSA SRF project

Previous contract amendments are as follows:

Amendment No. 1: Additional survey services

Effective Date: 8/29/2019 Amount: $0.00

Included re-allocation of fees to address additional engineering and survey costs related to changing site conditions without changing the overall contract amount.

Amendment No. 2: Additional Engineering services for Bidding Assistance, Design Revisions, Coordination, and Construction Administration

 Board Approval Date: 12/15/2020 Amount: $399,382.57

Included combining the bidding process of two separate projects, Avalon Road Master Pump Station with the subject project; eliminating chemical storage and adding Distributed Antenna System communication system conduits, and design and access coordination with the adjacent private apartment development and associated Avalon Road widening projects during design and construction.