Comptroller Main Webpage

The Clerk of the Board is responsible for keeping accurate minutes and maintaining Board records for each Board of County Commissioner (BCC) and Value Adjustment Board (VAB) meeting. In addition, every 4 years, the Clerk of the Board office provides staff support to the Charter Review Commission (CRC) appointed by the BCC. Please contact our office if you need an accessible version of documents on this page, and one will be provided.

Selection options are described below:

1. To search BCC records by meeting date and/or a specific term between September 23, 1869 and December 14, 2010, view the 'BCC Meetings' page.

2. To view BCC records by meeting date between January 4, 2011 through September 22, 2016, scroll down to locate the BCC meeting date.

3.
To search BCC records by a specific term between October 4, 2016 through Present, select the 'Search Records' tab.      

4.    To view VAB records by meeting date between June 20, 2013 through August 21, 2018, scroll down to locate the VAB meeting date. 

5.    To search CRC regular business meeting records by a specific term between February 25, 2019 through Present, select the 'Search Records' tab.

File #: 24-1134    Version: 1 Name:
Type: Procurement Status: Passed
File created: 7/18/2024 In control: Administrative Services Department
On agenda: 8/13/2024 Final action: 8/13/2024
Title: Approval of Amendment No. 4, Contract Y19-818, Eastern Water Reclamation Facility Phase 6A Plant Reclaimed Water System Expansion Project, with CDM Smith, in the total amount of $370,877.76, for a revised total contract amount of $3,518,270.65. ([Utilities Department Engineering Division] Procurement Division)
Attachments: 1. CO REQUEST #04 C19818 CMD SMITH SIGNED (1)

Interoffice Memorandum

 

DATE: July 18, 2024

 

TO: Mayor Jerry L. Demings and County Commissioners

 

FROM: Carrie Mathes, CFCM, NIGP-CPP, CPPO, C.P.M., Manager II, Procurement Division

 

CONTACT: Lindy A. Wolfe, P.E. LEED AP, Manager II, Utilities Engineering Division

 

PHONE: 407-254-9918

 

SUBJECT: Amendment No. 4, Contract Y19-818, Eastern Water Reclamation Facility Phase 6A Plant Reclaimed Water System Expansion Project

 

ACTION REQUESTED:

title

Approval of Amendment No. 4, Contract Y19-818, Eastern Water Reclamation Facility Phase 6A Plant Reclaimed Water System Expansion Project, with CDM Smith, in the total amount of $370,877.76, for a revised total contract amount of $3,518,270.65. ([Utilities Department Engineering Division] Procurement Division)

body


PROCUREMENT:

This amendment includes additional services related to final design, permitting, and construction administration.

Curtis Stanton Energy Center (CSEC) is a significant industrial user of reclaimed water effluent from the Eastern Water Reclamation Facility (EWRF). CSEC is currently scheduled to decommission a coal fired portion of CSEC which will reduce the reclaimed water demands of the facility by four million gallons per day by December 2025. Orange County Utilities identified three projects which were critical for the operation of the plant within the requirements of the current operating permit. The three projects were collectively bid as “EWRF Phase 6A” and are described as  the project packages listed below:

Package A: EWRF 6A Storage and Repump

Package B: EWRF Internal Recycle Pump Replacement Package C: EWRF Motor Control Center Replacement

This specific task authorization request is associated with project Package A. The three projects were originally designed separately, with the assumption that Packages B and C would complete construction first and Package A would complete construction later. Initially, the three packages were scheduled to be bid separately on different construction timelines. However, news of the CSEC decommissioning necessitated that the three packages be bid together, with Packages C and A to be operational by December 2025 and Package B soon after that date. The bidding approach and construction milestones were adjusted to expedite the completion of assets critical for storing and pumping excess reclaimed water in the Public Access Reuse system.

On June 4, 2024, Change Order No. 1 was approved amending the associated construction contract Y24-724 EWRF 6A to include construction of the Curry Ford Access Road and stormwater ponds. These assets were identified as critical for the completion of EWRF 6A and were previously unsuccessfully bid as part of Invitation for Bids Y24-712.

This authorization will provide additional engineering services necessary to carry out the project successfully throughout construction. The level of effort required from the CDM Smith team will exceed that of the originally anticipated effort due to several impacts as described below.

1. Significant design changes, additional permitting requirements, and additional clarifications required due to the expedited schedule, the combination of three separate design sets of specifications for the different packages, and addition of the access road and stormwater.

2. Increased complexity of construction phase services due to added intermediate milestones, as required to meet the December 2025 deadline.

3. Increased construction phase services. This increase in construction coordination meetings is required to accommodate the combination of the three packages, ensuring that critical assets are operational by December 2025. Further, since the time of initial scope development, the lead times of several major project assets, specifically electrical equipment, have significantly increased due to market availability, further adding complexity to the construction schedule. This authorization accounts for the decision to issue an owner direct purchase of transformers to reduce the long lead impact on the overall construction schedule.

These services will be performed in accordance with the lump sum and not-to exceed method. This project is located in District 4.

FUNDING:

Funding is available in account number 4420-038-1538-0025-6310.

APPROVALS:

The Utilities Engineering Division concurs with this recommendation.

 

 

REMARKS:

On August 6, 2020, the Board approved the selection of CDM Smith and authorized negotiation and execution of a contract by the Procurement Division provided that the contract does not exceed the budget amount of $3,000,000 for all phases of negotiation. This change order exceeds this amount and therefore requires BCC approval.

Below is a history of the task authorizations for EWRF Phase 6A.

Phase 1: Contract Executed with Preliminary Design services.

Effective Date: 11/09/2020 Amount: $485,985.97

Amendment No. 1:   Effective Date: 6/24/2021 Amount: $0

Amendment 1 revised the contract to include an additional sub consultant to perform preliminary design services.

Phase 2, Amendment No. 2: Final Design and Construction Administration Services

Effective Date: 8/17/2022 Amount: $2,661,406.92

Amendment 2 included design, permitting, bidding, and construction administration services for EWRF Phase 6A.

Amendment 3: Effective Date: 11/23/2022 Amount: $0

Encumber funds with a zero-dollar increase.