ACTION REQUESTED:
title
Approval and execution of (1) Resolution of the Orange County Board of County Commissioners regarding the Local Agency Program Supplemental Agreement No. 1 with the State of Florida Department of Transportation for the Shingle Creek Trail Phase 1 Segment 2 Project from State Road 528 to Destination Parkway and (2) State of Florida Department of Transportation Local Agency Program Supplemental Agreement Supplemental No. 1 Contract No. G1Y68 FPN: 430225-5-58/68-01. This Supplemental Agreement provides an additional $3,859,268 in grant funding with a new total grant amount of $10,168,886 and requires no local funding match. District 6. (Transportation Planning Division)
body
PROJECT: N/A
PURPOSE:
The Public Works Department, in partnership with the Florida Department of Transportation (FDOT), is advancing the Shingle Creek Trail Phase 1, Segment 2 project into the construction phase. The project will construct approximately 1.2 miles of multi-use trail from State Road 528 to Destination Parkway. The trail will be constructed within existing right-of-way and trail easements and will be up to 14 feet wide, with a minimum width of 12 feet. The project includes approximately 2,031 linear feet of boardwalk and 4,427 linear feet of asphalt trail, along with concrete ribbon curbs, 42-inch pedestrian/ bicycle picket railing, drainage pipe and mitered end-section reconstruction, signing and pavement markings, and performance turf installation. Site preparation activities include erosion control, clearing and grubbing, tree removal, excavation, and embankment construction. All pedestrian facilities will be designed and constructed to meet current ADA standards.
This project is funded in accordance with the Local Agency Program Agreement between Orange County and the FDOT. The project funding is amended through Supplemental Agreement No. 1 to reflect the construction contract award amount of $9,302,844 and the Construction Engineering and Inspection (CEI) contract award amount of $866,042, resulting in a total project cost of $10,168,886. The supplemental agreement increased construction funding by $3,683,255 and CEI funding by $176,031, with the revised funding provided through federal funds. No local funds were required.
The County Attorney’s Office, Risk Management Division, Public Works Engineering Division, and the Transportation Planning Division have reviewed this Resolution and Supplemental Agreement and find them acceptable.
BUDGET: N/A