Comptroller Main Webpage

The Clerk of the Board is responsible for keeping accurate minutes and maintaining Board records for each Board of County Commissioner (BCC) and Value Adjustment Board (VAB) meeting. In addition, every 4 years, the Clerk of the Board office provides staff support to the Charter Review Commission (CRC) appointed by the BCC. Please contact our office if you need an accessible version of documents on this page, and one will be provided.

Selection options are described below:

1. To search BCC records by meeting date and/or a specific term between September 23, 1869 and December 14, 2010, view the 'BCC Meetings' page.

2. To view BCC records by meeting date between January 4, 2011 through September 22, 2016, scroll down to locate the BCC meeting date.

3.
To search BCC records by a specific term between October 4, 2016 through Present, select the 'Search Records' tab.      

4.    To view VAB records by meeting date between June 20, 2013 through August 21, 2018, scroll down to locate the VAB meeting date. 

5.    To search CRC regular business meeting records by a specific term between February 25, 2019 through Present, select the 'Search Records' tab.

File #: 25-072    Version: 1 Name:
Type: Recommendation Status: Passed
File created: 12/16/2024 In control: Administrative Services Department
On agenda: 1/7/2025 Final action: 1/7/2025
Title: Approval of Change Order No 8, Contract Y20-766 Michigan Campus GOV Cottage Restroom & Kitchen Renovations, with Caf? Construction & Development Inc in the amount of $510,951.89, for a revised lump sum contract amount of $2,446,872.77. District 3. (Capital Projects Division)
Attachments: 1. 2025-01-07-Administrative Services Department Consent Item-05, 2. 2025-01-07 Administrative Services Department Consent Item-05 - Executed

Interoffice Memorandum

 

DATE: December 16, 2024

 

TO: Mayor Jerry L. Demings and County Commissioners

 

THROUGH: Anne Kulikowski, Director, Administrative Services Department

 

FROM: Sara Flynn-Kramer, Manager, Capital Projects Division

 

CONTACT: Sara Flynn-Kramer

 

PHONE: 407-836-0048

 

DIVISION: Capital Projects Division

 

ACTION REQUESTED:

title

Approval of Change Order No 8, Contract Y20-766 Michigan Campus GOV Cottage Restroom & Kitchen Renovations, with Café Construction & Development Inc in the amount of $510,951.89, for a revised lump sum contract amount of $2,446,872.77.  District 3. (Capital Projects Division)

body


PROJECT:
Michigan Campus GOV Cottage Restroom & Kitchen Renovations

 

PURPOSE: To provide funding for additional construction services to complete the capital improvements.

 

BUDGET: Accounting Line Number: 1023-043-0263-3810

 

JUSTIFICATION/DISCUSSION:

This project is a renovation of five cottages that are a home to some of the children who live at Great Oaks Village on the Michigan Street Campus.  The scope of this project is to renovate the existing restrooms and kitchens in these five cottages and to bring them up to code and to comply with the Americans with Disabilities Act of 1990.  Three of the cottages sit in a lower lying area of the campus and two of the cottages sit in a higher location.  During the design of this project field investigative work was done by the consultants to identify the as-built and existing conditions as much as possible.  They were unable to do any real destructive investigative work inside the cottages because the cottages are a home for these children.  This change order is for additional work required for the third of the five cottages, the Owles Cottage.  After the construction contract was awarded and during the initial demolition for the contract work, substantial hidden water damage was discovered that had destroyed the underlying materials in most of the interior of the Owles Cottage.  This work includes the wall and ceiling framing, insulation, electrical wiring, fire alarm work, shelving, water lines, HVAC, ductwork, door and window frames, and the flooring underlayment.  In this cottage significantly more electrical work had to be replaced than the first two cottages to be in compliance with code.  This damage was not visible and was not accessible prior to this demolition work that was not able to start until after the children were relocated on campus.  All this hidden damage had to be repaired by replacing the damaged areas with all new materials and finishes including painting.   The majority of the work in this change order is limited to the Owles Cottage, which is the third of the three cottages in the lower lying area of the campus to be renovated.  This type of hidden water damage is not anticipated in the two newer cottages that are located at a higher elevation.   This change order also contains work in the first three cottages including extra work to remove the brick under the flooring and prepare the subfloor for the new flooring, and some exterior work site work around the three cottages.  After this cottage is complete and put back into service for the children, work will start in the fourth cottage which is in the higher-lying area. 

 

PREVIOUS ACTIONS TO THIS CONTRACT:

The Contract award was approved on November 12, 2019.

 

Original Contract dated February 4, 2021                         Lump sum amount - $  1,248,000.00

 

Change Order No. 1 dated December 20, 2021  Lump sum amount - $      62,400.00

Fire alarm upgrades and transom removal

 

Change Order No. 2 dated April 8, 2022                          Lump sum amount - $    252,838.53

Unforeseen required renovations to Cottage 1,

the Day Cottage, including wall and ceiling framing,

insulation, electrical, fire alarm, shelving, water lines,

HVAC, ductwork, door and window frames,

and flooring underlayment

 

Change Order No. 3 dated July 20, 2022                          Lump sum amount - $        8,949.64

Permit fees

 

Change Order No. 4 dated September 1, 2022  Lump sum amount - $         3,640.88

Fire alarm revisions for code compliance

 

Change Order No. 5 dated January 4, 2023       Lump sum amount - $         7,035.43

Shelving for DCF compliance

 

Change Order No. 6 dated May 16, 2023                         Lump sum amount - $         8,466.90

Attic access to meet code

 

Change Order No. 7 dated November 2, 2023   Lump sum amount - $     344,589.50

Unforeseen required renovations to Cottage 2,

the Highsmith Cottage, including wall and

ceiling framing, insulation, electrical wiring,

fire alarm work, shelving, water lines, HVAC,

ductwork, door and window frames, and the

flooring underlayment. 

 

Proposed Change Order No. 8                                                        Lump sum amount - $     510,951.89

Unforeseen required renovations to Cottage 3,

The Owles Cottage, including wall and ceiling

Framing, insulation, electrical wiring, fire alarm

Work, shelving, water lines, HVAC, ductwork,

door and window frames and the flooring

underlayment, floor preparation and site work

for the first three cottages

 

Proposed Final Contract Amount                                                         $  2,446,872.77