Comptroller Main Webpage

The Clerk of the Board is responsible for keeping accurate minutes and maintaining Board records for each Board of County Commissioner (BCC) and Value Adjustment Board (VAB) meeting. In addition, every 4 years, the Clerk of the Board office provides staff support to the Charter Review Commission (CRC) appointed by the BCC. Please contact our office if you need an accessible version of documents on this page, and one will be provided.

Selection options are described below:

1. To search BCC records by meeting date and/or a specific term between September 23, 1869 and December 14, 2010, view the 'BCC Meetings' page.

2. To view BCC records by meeting date between January 4, 2011 through September 22, 2016, scroll down to locate the BCC meeting date.

3.
To search BCC records by a specific term between October 4, 2016 through Present, select the 'Search Records' tab.      

4.    To view VAB records by meeting date between June 20, 2013 through August 21, 2018, scroll down to locate the VAB meeting date. 

5.    To search CRC regular business meeting records by a specific term between February 25, 2019 through Present, select the 'Search Records' tab.

File #: 25-547    Version: 1 Name:
Type: Recommendation Status: Consent Agenda
File created: 3/20/2025 In control: Public Works Department
On agenda: 4/8/2025 Final action:
Title: Approval of Change Order Number 1, Purchase Order M114783, Emergency Connection of Temporary Pumps to the Existing Pump Station and Additional Pumping, with Thalle Construction Co., Inc. in the amount of $216,561, for a revised total amount of $827,509.76. District 6. (Stormwater Management Division)
Attachments: 1. 25-547_4.8.2025_2024 Hurricane Season Pumping Support Orlo Vista Flood Mitigation
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Interoffice Memorandum

 

DATE: March 20, 2025

 

TO: Mayor Jerry L. Demings and County Commissioners

 

THROUGH: N/A

 

FROM: Joseph C. Kunkel, P. E., Director, Public Works Department

 

CONTACT: Michael J. Drozeck, P. E., CFM, Manager

 

PHONE: (407) 836-7945

 

DIVISION: Stormwater Management Division

 

ACTION REQUESTED:

title

Approval of Change Order Number 1, Purchase Order M114783, Emergency Connection of Temporary Pumps to the Existing Pump Station and Additional Pumping, with Thalle Construction Co., Inc. in the amount of $216,561, for a revised total amount of $827,509.76. District 6. (Stormwater Management Division)

body


PROJECT:
N/A

 

PURPOSE:
A change order in the amount of $216,561 for the Orlo Vista Flood Mitigation Project is needed to cover the cost associated with the following: a) connecting two temporary pump discharge pipes to the pump station’s spare 30-inch spare discharge port and b) extending the emergency pumping from December 2024 through January 2025 to drawdown and maintain the West Pond water level at elevation 62 ft. The temporary pumps supplement the existing pump station's capacity and act as a backup to the pump station in case of failure during large storm events. This is critical to maximize available storage/flood protection in advance of the 2025 hurricane season.  

The original Emergency Purchase order M114783 was approved by the Board on May 21, 2024, for the emergency pumping during the 2024 Hurricane Season (June through November). 

 

BUDGET: N/A