Legislation Details

File #: 26-1059    Version: 1 Name:
Type: Procurement Status: Consent Agenda
File created: 8/24/2026 In control: Administrative Services Department
On agenda: 9/29/2026 Final action:
Title: Ratification of Purchase Order M122112, Bridge 754080 University Boulevard Bridge over The Little Econlockhatchee River Emergency Repairs, with Southern Road and Bridge LLC, in the estimated amount of $2,677,318.50. ([Public Works Department Roads and Drainage Division] Procurement Division)
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Interoffice Memorandum

DATE: August 24, 2026

TO: Mayor Jerry L. Demings and County Commissioners

FROM: Carrie Mathes, FNIGP, CFCM, NIGP-CPP, CPPO, C.P.M., Manager II, Procurement Division

CONTACT: Eduardo Avellaneda, M.S., P.E., Manager II, Roads & Drainage Division

PHONE: 407-836-7871

SUBJECT: Ratification of Purchase Order M122112, Bridge 754080 University Boulevard Bridge over the Little Econlockhatchee River Emergency Repairs

ACTION REQUESTED:
title
Ratification of Purchase Order M122112, Bridge 754080 University Boulevard Bridge over The Little Econlockhatchee River Emergency Repairs, with Southern Road and Bridge LLC, in the estimated amount of $2,677,318.50. ([Public Works Department Roads and Drainage Division] Procurement Division)
body

PROCUREMENT:
The purchase order provides for the emergency repairs of pile jacketing and slope repairs and remediation of Bridge 754080 University Boulevard Bridge over the Little Econlockhatchee River. This project is located in District 5.
FUNDING:
Funding is available in account numbers 1002-072-2906-3816 and 1004-072-2912-3816.
APPROVALS:
The Roads and Drainage Division concurs with this recommendation.
REMARKS:
Bridge ID 754080 University Boulevard Bridge over the Little Econlockhatchee River is experiencing critical structural damage, including a major collapse of the west side slope as well as deterioration of the bridge piles due to extensive spalling and severe scour conditions. The slope failure and pile deterioration present significant structural risks requiring urgent remediation for infrastructure stability and public safety.
The scope of work includes structural pile jacketing to repair deteriorated bridge piles and restore axial and lateral load capacity. The work also includes stabilization and repair of the collapsed west side slope and stream banks, repairs to structural cracks and undermined approach slabs, and grouting of subsurface voids to prevent further soil loss, settlement, and deteri...

Click here for full text