Skip to main content
Comptroller Main Webpage

The Clerk of the Board is responsible for keeping accurate minutes and maintaining Board records for each Board of County Commissioner (BCC) and Value Adjustment Board (VAB) meeting. In addition, every 4 years, the Clerk of the Board office provides staff support to the Charter Review Commission (CRC) appointed by the BCC. Please contact our office if you need an accessible version of documents on this page, and one will be provided.

Selection options are described below:

1. To search BCC records by meeting date and/or a specific term between September 23, 1869 and December 14, 2010, view the 'BCC Meetings' page.

2. To view BCC records by meeting date between January 4, 2011 through September 22, 2016, scroll down to locate the BCC meeting date.

3.
To search BCC records by a specific term between October 4, 2016 through Present, select the 'Search Records' tab.      

4.    To view VAB records by meeting date between June 20, 2013 through August 21, 2018, scroll down to locate the VAB meeting date. 

5.    To search CRC regular business meeting records by a specific term between February 25, 2019 through Present, select the 'Search Records' tab.

File #: 25-743    Version: 1 Name:
Type: Recommendation Status: Consent Agenda
File created: 4/30/2025 In control: Administrative Services Department
On agenda: 5/20/2025 Final action:
Title: Approval of Change Order No 8, Contract Y23-724 Corrections Genesis Sanitary Pipe Replacement, with S A Casey Construction Inc in the amount of $151,628.46, for a revised lump sum contract amount of $2,793,777.62. District 6. (Capital Projects Division)
Attachments: 1. 2025-05-20-Administrative Services Department Consent Item-02
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Interoffice Memorandum

DATE: April 30, 2025

TO: Mayor Jerry L. Demings and County Commissioners

THROUGH: Anne Kulikowski, Director, Administrative Services Department

FROM: Sara Flynn-Kramer, Manager, Capital Projects Division

CONTACT: Sara Flynn-Kramer

PHONE: 407-836-0048

DIVISION: Capital Projects

ACTION REQUESTED:
title
Approval of Change Order No 8, Contract Y23-724 Corrections Genesis Sanitary Pipe Replacement, with S A Casey Construction Inc in the amount of $151,628.46, for a revised lump sum contract amount of $2,793,777.62. District 6. (Capital Projects Division)
body

PROJECT: Corrections Genesis Sanitary Pipe Replacement

PURPOSE: To provide funding for additional construction services to complete the capital improvements.

BUDGET: Accounting Line Number: 1023-043-2093-3810

JUSTIFICATION/DISCUSSION:
The original scope of work for the project provided for a complete replacement of all the interior sewer piping and simple direct tie-ins to the existing sanitary system from new locations within the building. Unforeseen existing hidden conditions prevented these sewer tie-ins from being installed per the construction plans. Because the new sewer pipe work in the buildings was rerouted to new locations, it made it impossible to simply reconnect the new pipes to the existing piping leaving the building. There were numerous unforeseen underground obstructions in the area requiring two new separate sewer tie-ins on opposite sides of the building. Because of the existing grades in the area and the fall required for the new sewer piping, both new sewer tie-ins required new underground lift stations to be able to connect the new sewer lines to the existing exterior sewer system. This new work was permitted and coordinated with the Orange County Utilities Department.

PREVIOUS ACTIONS TO THIS CONTRACT:
The Contract award was approved on March 7, 2023.
Original Contract dated April 11, 2023 Lump sum amount - $ 2,425,000.00
Change Order No. 1...