Legislation Details

File #: 26-1057    Version: 1 Name:
Type: Procurement Status: Consent Agenda
File created: 8/24/2026 In control: Administrative Services Department
On agenda: 9/29/2026 Final action:
Title: Ratification of Purchase Order M122108, Emergency Repair of Master Pump Station F3167 Discharge Force Main, with Metro Equipment Service, Inc., in the estimated amount of $4,900,000. ([Utilities Department Field Services Division] Procurement Division)
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Interoffice Memorandum

DATE: August 24, 2026

TO: Mayor Jerry L. Demings and County Commissioners

FROM: Carrie Mathes, FNIGP, CFCM, NIGP-CPP, CPPO, C.P.M., Manager II, Procurement Division

CONTACT: Troy Layton, P.E., Manager II, Field Services Division

PHONE: 407-254-9794

SUBJECT: Ratification of Purchase Order M122108, Emergency Repair of Master Pump Station F3167 Discharge Force Main

ACTION REQUESTED:
title
Ratification of Purchase Order M122108, Emergency Repair of Master Pump Station F3167 Discharge Force Main, with Metro Equipment Service, Inc., in the estimated amount of $4,900,000. ([Utilities Department Field Services Division] Procurement Division)
body

PROCUREMENT:
The purchase order provides for the emergency repair of a 30-inch wastewater force main discharging from F3167 master pump station south of the Toll Road 528. This project is located in District 1.
FUNDING:
Funding is available in account number 4420-038-1574-0016-6340.
APPROVALS:
The Field Services Division concurs with this recommendation.
REMARKS:
Orange County Utilities (OCU) requested authorization to procure emergency construction services to complete permanent repairs to a failed wastewater transmission force main discharging from master pump station F3167 south of the Toll Road 528. The damage to the force main caused a sanitary sewer overflow, which has a risk of impacting public health and environmental safety. The force main is a transmission main of sanitary sewer within the OCU collection system. Repair was required for this to operate correctly. The overflow has been contained but the pipe needs to be bypassed and replaced to restore the flow conditions.
OCU responded to a wastewater force main break near the intersection and State Road 528. The existing 30-inch concrete force main failed due to corrosion and cannot be repaired due to the size and type of pipe.
The emergency work consisted of replacing approximately 900 linear feet of the existing 30-inch concrete forc...

Click here for full text