Comptroller Main Webpage

The Clerk of the Board is responsible for keeping accurate minutes and maintaining Board records for each Board of County Commissioner (BCC) and Value Adjustment Board (VAB) meeting. In addition, every 4 years, the Clerk of the Board office provides staff support to the Charter Review Commission (CRC) appointed by the BCC. Please contact our office if you need an accessible version of documents on this page, and one will be provided.

Selection options are described below:

1. To search BCC records by meeting date and/or a specific term between September 23, 1869 and December 14, 2010, view the 'BCC Meetings' page.

2. To view BCC records by meeting date between January 4, 2011 through September 22, 2016, scroll down to locate the BCC meeting date.

3.
To search BCC records by a specific term between October 4, 2016 through Present, select the 'Search Records' tab.      

4.    To view VAB records by meeting date between June 20, 2013 through August 21, 2018, scroll down to locate the VAB meeting date. 

5.    To search CRC regular business meeting records by a specific term between February 25, 2019 through Present, select the 'Search Records' tab.

File #: 25-612    Version: 1 Name:
Type: Recommendation Status: Work Session
File created: 4/3/2025 In control: Public Works Department
On agenda: 4/22/2025 Final action:
Title: Chuluota Road Roadway Conceptual Analysis Study. (Transportation Planning Division)
Attachments: 1. ICE APPENDIX B, Traffic, 2. ICE APPENDIX C, Stage 1 Analysis, 3. ICE APPENDIX D, Stage 2 Analysis, 4. ICE APPENDIX F, Drainage, 5. ICE APPENDIX, E, Stage 3 Analysis, 6. 1) Chuluota ICE Addendum Report, V10, 7. ICE APPENDIX G, Public Involvement, 8. ICE APPENDIX A, Stage 2 Alternatives, V1, Mar, 2025, 9. 7) RCA Appendix F, CSER Report_Chuluota Road_10042021, 10. 8) RCA Appendix G, Chuluota Road Final DTTM, 2022-09-13, 11. 9) RCA Appendix H, Final Chuluota Pond Siting Report-all_Oct22 (2), 12. 10) RCA Appendix I, Chuluota Road Access Management, Nov, 2022, 13. 1) Chuluota RCA Report Draft Final, V8, Mar, 2025, 14. 2) RCA Appendix A, Roadway Plans, Mar, 2025, Complete, 15. 3) RCA Appendix B, 100% CHULUOTA ROAD RW ID MAP, Mar, 2025, 16. 4) RCA Appendix C, Public Involvement Summary, 17. 5)RCAAppendix D, Roadway Soil Survey Report_Chuluota 4.8.22-ss, 18. 6)RCA Appendix E, Chuluota Draft Natural Resources Report
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Interoffice Memorandum

 

DATE: April 3, 2025

 

TO: Mayor Jerry L. Demings and County Commissioners

 

THROUGH: N/A

 

FROM: Joseph C. Kunkel, P.E., Director, Public Works Department

 

CONTACT: Brian R. Sanders, Manager

 

PHONE: (407) 836-8022

 

DIVISION: Transportation Planning Division

 

ACTION REQUESTED:

title

Chuluota Road Roadway Conceptual Analysis Study. (Transportation Planning Division)

 

body


PROJECT:
N/A

 

PURPOSE:
The Orange County Transportation Planning Division has completed the
Chuluota Road Intersection Control Evaluation (ICE) study as part of the Chuluota Road Roadway Conceptual Analysis (RCA) study. 

The Chuluota Road RCA study recommended improvements providing additional vehicular capacity on Chuluota Road from SR 50 (East Colonial Drive) to Lake Pickett Road, a distance of approximately 1.9 miles.  The purpose of the ICE study was to consider a two and four -lane option using alternative intersection control methods. Both studies were undertaken to develop the most appropriate road alignment and intersection configuration with stormwater facilities and bicycle and pedestrian accommodations, while minimizing environmental impacts.   

The Chuluota Road RCA addresses features such as the existing corridor characteristics, developing future / projected traffic volumes and suitable alternatives, and recommend roadway improvements for the proposed facility. The ICE analysis confirmed the need for improvement of the roadway to four lanes using original intersection configurations. In addition to the originally proposed improvements, staff will present a roundabout option to control speeding and potentially reduce the severity of crashes and the probability of fatal injury within the study segment. 

At the April 22, 2025, Work Session, staff will present the Chuluota Road RCA background and the ICE study analysis, and recommendations. This item is for informational purposes only; no action is required by the Board.

 

BUDGET: N/A