Skip to main content
Comptroller Main Webpage

The Clerk of the Board is responsible for keeping accurate minutes and maintaining Board records for each Board of County Commissioner (BCC) and Value Adjustment Board (VAB) meeting. In addition, every 4 years, the Clerk of the Board office provides staff support to the Charter Review Commission (CRC) appointed by the BCC. Please contact our office if you need an accessible version of documents on this page, and one will be provided.

Selection options are described below:

1. To search BCC records by meeting date and/or a specific term between September 23, 1869 and December 14, 2010, view the 'BCC Meetings' page.

2. To view BCC records by meeting date between January 4, 2011 through September 22, 2016, scroll down to locate the BCC meeting date.

3.
To search BCC records by a specific term between October 4, 2016 through Present, select the 'Search Records' tab.      

4.    To view VAB records by meeting date between June 20, 2013 through August 21, 2018, scroll down to locate the VAB meeting date. 

5.    To search CRC regular business meeting records by a specific term between February 25, 2019 through Present, select the 'Search Records' tab.

File #: 25-999    Version: 1 Name:
Type: Procurement Status: Consent Agenda
File created: 7/1/2025 In control: Administrative Services Department
On agenda: 8/5/2025 Final action:
Title: Approval of Amendment No. 2, Contract Y20-905D, Engineering Services for Pump Station Package 47 Improvements, with Tetra Tech, Inc, in the amount of $115,784.54 for a revised award amount of $676,775.42. ([Utilities Department Engineering Division] Procurement Division)
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Interoffice Memorandum

DATE: July 2, 2025

TO: Mayor Jerry L. Demings and County Commissioners

FROM: Carrie Mathes, CFCM, NIGP-CPP, CPPO, C.P.M., Manager II, Procurement Division

CONTACT: Lindy A. Wolfe, P.E. LEED AP, Manager II, Utilities Engineering Division

PHONE: 407-254-9918

SUBJECT: Approval of Amendment No. 2, Contract Y20-905D, Engineering Services for Pump Station R/R Package 47 Improvements

ACTION REQUESTED:
title
Approval of Amendment No. 2, Contract Y20-905D, Engineering Services for Pump Station Package 47 Improvements, with Tetra Tech, Inc, in the amount of $115,784.54 for a revised award amount of $676,775.42. ([Utilities Department Engineering Division] Procurement Division)
body

PROCUREMENT:
This amendment will provide additional engineering and construction administration services for the Pump Station Package 47 Improvements project and add 116 days to the contract with a revised completion date of March 5, 2026.
1. Preliminary Engineering: Includes updated odor control evaluation memos for Pump Station 3322 and Pump Station 3965.
2. Construction Documents: Additional civil and electrical drawings for relocation of Pump Station 3322 Capehart wet well and driveway, Pump Station 3322 Capehart 12-inch force main abandonment, connection of Pump Station 10931 discharge force main to 16-inch force main on Harrell Road, electrical improvements to Pump Station F3034 pump replacement, and full extent of 4-inch force main removal.
3. Survey: Covers topographic survey for Pump Station 3965 Harrell Road of existing utilities and roadways near pump station entrance that were constructed after the original survey was completed, to locate the 16-inch and 10-inch force mains near the intersection of Harrell Road and Trevarthon Road, and 10 additional Verified Vertical and Horizontal test holes, used in Subsurface Utility Engineering to confirm the exact location and depth of underground utilities.
4. Construction Administration: Additional 12 months of...