File #: 26-0205    Version: 1 Name:
Type: Recommendation Status: Passed
File created: 1/21/2026 In control: Utilities Department
On agenda: 2/10/2026 Final action: 2/10/2026
Title: Approval and execution of Water and Wastewater Flow Monitoring Agreement by and between Northrop Grumman Systems Corporation and Orange County for an initial 10-year period to monitor water usage and wastewater discharges from the facility. District 2. (Engineering Division)
Attachments: 1. Northrop Grumman Executed FMA (1).pdf, 2. 2026-02-10 Utilities Department Consent Item-02

Interoffice Memorandum

 

DATE: January 21, 2026

 

TO: Mayor Jerry L. Demings and County Commissioners

 

THROUGH: N/A

 

FROM: Ed Torres, M.S., P.E., LEED AP, Director, Utilities

 

CONTACT: Lindy Wolfe, P.E., LEED AP, Manager, Engineering Division

 

PHONE: 407-254-9918

 

DIVISION: Engineering Division

 

ACTION REQUESTED:

title

Approval and execution of Water and Wastewater Flow Monitoring Agreement by and between Northrop Grumman Systems Corporation and Orange County for an initial 10-year period to monitor water usage and wastewater discharges from the facility. District 2. (Engineering Division)

body


PROJECT:
N/A

 

PURPOSE: The property owner, Northrop Grumman Systems Corporation, is renovating an existing facility to expand its microelectronics manufacturing capabilities at 2787 S Orange Blossom Trail, Apopka, Florida 32703. Water and wastewater capital charges for the property were determined based on flow estimates pursuant to subsections 37-5(b)(4)b and 37-5(b)(5)b, respectively, of the Orange County Code. 

The property owner has submitted a signed and sealed engineering study estimating water and wastewater flows and has agreed to enter into a Flow Monitoring Agreement with the Utilities Department. 

The agreement provides for an initial 10-year period to monitor the water usage and wastewater discharges from the facility. The County may extend the monitoring period in the event of a material breach by the property owner, as described in the agreement. During the term of the agreement, a monthly monitoring fee will be assessed, and additional capital charges will be levied if the six-month average water or wastewater flow exceeds the signed and sealed engineering estimate at any time. 

The County Attorney’s Office and Risk Management Division reviewed the agreement and find it acceptable as to form. Utilities Department staff recommends approval.

 

BUDGET: N/A