Comptroller Main Webpage

The Clerk of the Board is responsible for keeping accurate minutes and maintaining Board records for each Board of County Commissioner (BCC) and Value Adjustment Board (VAB) meeting. In addition, every 4 years, the Clerk of the Board office provides staff support to the Charter Review Commission (CRC) appointed by the BCC. Please contact our office if you need an accessible version of documents on this page, and one will be provided.

Selection options are described below:

1. To search BCC records by meeting date and/or a specific term between September 23, 1869 and December 14, 2010, view the 'BCC Meetings' page.

2. To view BCC records by meeting date between January 4, 2011 through September 22, 2016, scroll down to locate the BCC meeting date.

3.
To search BCC records by a specific term between October 4, 2016 through Present, select the 'Search Records' tab.      

4.    To view VAB records by meeting date between June 20, 2013 through August 21, 2018, scroll down to locate the VAB meeting date. 

5.    To search CRC regular business meeting records by a specific term between February 25, 2019 through Present, select the 'Search Records' tab.

File #: 24-1160    Version: 1 Name:
Type: Recommendation Status: Passed
File created: 7/24/2024 In control: Public Works Department
On agenda: 8/13/2024 Final action: 8/13/2024
Title: Approval and execution of Utility Relocation Agreement by and between Orange County, Florida and Duke Energy Florida, LLC, d/b/a Duke Energy for the relocation of utility facilities on Bates Road from the Orange/Osceola County line to State Road 417. District 5. (Engineering Division)
Attachments: 1. 24-1160_8.13.2024 URA Between Duke_OC for Bates Rd Bridge Agreement Attachments Duke Signed, 2. 2024-08-13 Public Works Department Consent Item-01

Interoffice Memorandum

 

DATE: July 24, 2024

 

TO: Mayor Jerry L. Demings and County Commissioners

 

THROUGH: N/A

 

FROM: Joseph C. Kunkel, P. E., Director, Public Works Department

 

CONTACT: Raymond L.A. Williams, P.E., Manager

 

PHONE: (407) 836-7909

 

DIVISION: Engineering Division

 

ACTION REQUESTED:

title

Approval and execution of Utility Relocation Agreement by and between Orange County, Florida and Duke Energy Florida, LLC, d/b/a Duke Energy for the relocation of utility facilities on Bates Road from the Orange/Osceola County line to State Road 417.  District 5. (Engineering Division)

body


PROJECT:
N/A

 

PURPOSE:
Orange County plans to replace the existing Bates Road bridge and pedestrian bridge extension with a new bridge built to current standards and to raise the bridge above the floodplain elevation for the Crane Strand Canal. The limits of the project are from Glynn Street to Crown Jewel Court within Commission District 5.  A Utility Relocation Agreement was negotiated between Orange County and Duke Energy to facilitate the relocation of utility facilities that would interfere with the proposed bridge construction.   

Per the agreement, Orange County will be responsible for costs and expenses incurred in relocating the utility facilities that are located within dedicated Duke Energy utility easements.  The actual costs for which Orange County would be responsible are not to exceed the estimated cost of $32,847.30 by more than 20%. Orange County will be required to approve any excess work in writing prior to its performance.  

The Public Works Engineering Division and the County Attorney’s Office have reviewed the agreement and find the terms and conditions acceptable.

 

BUDGET: N/A