19-1791
| 1 | 1. | | Record/Minutes | Approval of the minutes of the October 22, 2019 meeting of the Board of County Commissioners. (Clerk's Office) | Approved | Pass |
Action details
|
Not available
|
19-1798
| 1 | 2. | | Budget/Funding | Approval of the check register authorizing the most recently disbursed County funds, having been certified that same have not been drawn on overexpended accounts. Periods are as follows:
- November 8, 2019, to November 14, 2019; $17,678,892.50
- November 15, 2019, to November 21, 2019; $36,157,788.25
- November 22, 2019, to November 26, 2019; $13,240,277.82.
(Finance/Accounting) | Approved | Pass |
Action details
|
Not available
|
19-1799
| 1 | 1. | | Appointment | Confirmation of Commissioner VanderLey’s reappointment to the Big Sand Lake Advisory Board of Ed Grunloh and Philip Morrill with terms expiring December 31, 2021, and appointment of Alfred Barry with a term expiring December 31, 2020. (Agenda Development Office) | Approved | Pass |
Action details
|
Not available
|
19-1800
| 1 | 2. | | Appointment | Confirmation of Commissioner Moore's reappointment of Henry Land, II and Kenneth Harris to the Lake Ola Advisory Board with terms expiring December 31, 2021. (Agenda Development Office) | Approved | Pass |
Action details
|
Not available
|
19-1801
| 1 | 3. | | Appointment | Confirmation of Commissioner VanderLey's reappointment of Lorraine Burch and Lloyd H. Woosley to the Butler Chain of Lakes Advisory Board with terms expiring December 31, 2023. (Agenda Development Office) | Approved | Pass |
Action details
|
Not available
|
19-1802
| 1 | 4. | | Appointment | Confirmation of Commissioner VanderLey's reappointment of Linda Zygmunt, Valerie Deneen, and Dennis Wells to the Lake Rose Advisory Board with terms expiring December 31, 2021. (Agenda Development Office) | Approved | Pass |
Action details
|
Not available
|
19-1803
| 1 | 5. | | Appointment | Approval of the Membership and Mission Review Board’s recommendations for advisory board appointments and reappointments. (Agenda Development Office)
A. Agricultural Advisory Board: Reappointment of Ryan C. Beck in the citrus industry representative category, Anne Nelson and Steven Brown in the foliage industry representative category, Anne Kathrein Markle in the flowering plant industry representative category, and Joseph R. Graham in the at large representative category with terms expiring December 31, 2021.
B. Animal Services Advisory Board: Reappointment of Dr. Nanette Parratto-Wagner in the veterinarian representative category and the appointment of Rosina A. McVicker to succeed Lisa Franchina in the at large representative category with terms expiring December 31, 2021.
C. Commission on Aging: Appointment of George McZeal, Jr. to succeed Sandria J. Foster in the transportation representative category with a term expiring June 30, 2021.
D. Development Advisory Board: Reappointment of Dallas Austin in the primary group (developer) representative category with a term e | Approved | Pass |
Action details
|
Not available
|
19-1804
| 1 | 6. | | Resolution | Approval and execution of Resolution 2019-B-07 for the issuance of Multi-Family Housing Mortgage Revenue Bonds to finance the acquisition and construction of Orlando Senior New Construction Apartments, a proposed multifamily rental development in Orange County, Florida, District 3, in an amount not to exceed $50,000,001. (Housing Finance Authority) | Approved | Pass |
Action details
|
Not available
|
19-1805
| 1 | 7. | | Recommendation | Approval of revisions to 1) Orange County Policy 201.9 Shift Differential with an effective date of July 28, 2019; and 2) Orange County Policy 308.6 Administrative Leave and 308.9 Executive Employee Resignation Leave with an effective date of January 1, 2020. (Human Resources Division) | Approved | Pass |
Action details
|
Not available
|
19-1806
| 1 | 8. | | Budget/Funding | Approval for the Orange County Sheriff’s Office to spend $1,000 from the Law Enforcement Trust Fund to provide an eligible contribution to Man Up Mentoring, Inc. (Office of Management and Budget) | Approved | Pass |
Action details
|
Not available
|
19-1807
| 1 | 9. | | Budget/Funding | Approval of budget amendments #20-13 and #20-14. (Office of Management and Budget) | Approved | Pass |
Action details
|
Not available
|
19-1808
| 1 | 10. | | Budget/Funding | Approval of budget transfer #20C-0036. (Office of Management and Budget) | Approved | Pass |
Action details
|
Not available
|
19-1809
| 1 | 11. | | Budget/Funding | Approval of CIP amendment #20C-0036. (Office of Management and Budget) | Approved | Pass |
Action details
|
Not available
|
19-1810
| 1 | 12. | | Budget/Funding | Ratification of payment of Intergovernmental claims of October 10, 2019, October 24, 2019, and November 7, 2019, totaling $1,230,094.78. (Risk Management Division) | Approved | Pass |
Action details
|
Not available
|
19-1811
| 1 | 1. | | Budget/Funding | Approval of the Tourist Development Tax Sports Incentive Committee’s recommendations for sports incentive funding pursuant to the terms and conditions of funding agreements between Visit Orlando and the Greater Orlando Sports Commission Inc. and authorization for Visit Orlando to enter into such agreements as follows: 1) in the amount of $75,000 for one bid fee for either the 2020, 2021, or 2022 Worldwide Wrestling Entertainment SummerSlam Event to be held at the Amway Center in Orlando; 2) in the amount of $50,000 for one bid fee for either the 2020, 2021, or 2022 Worldwide Wrestling Entertainment Survivor Series Event to be held in Orlando; and 3) in the amount of $137,500 for promotion and advertising expenses associated with the 2020 Florida Cup Soccer Event to be held at Exploria Stadium in Orlando. | Approved | Pass |
Action details
|
Not available
|
19-1812
| 1 | 2. | | Agreement/Contract | Approval of the settlement of the case of Orange County v. Lock Haven Baptist Church, Case No. 2018-CA-008830-O, Parcels 1006, 7006, 7006A, 7006B and 7006C, Boggy Creek Road South Project (Osceola County line to SR 417), and authorization for the County Attorney’s Office to seek the entry of the proposed Stipulated Final Judgment by the Court. | Approved | Pass |
Action details
|
Not available
|
19-1813
| 1 | 1. | | Agreement/Contract | Approval of Change Order No. 2, Contract Y19-759-JS, Orange County Convention Center West Building Meeting Rooms Renovation, with CORE Construction, in the amount of $4,320,521.16, for a revised contract amount of $34,919,521.16. Further request approval of Owner Direct Purchase Order for mechanical equipment and ancillary services not to exceed the amount of $3,644,660.64, included and as part of the revised contract amount. (Facility Operations Division) | Approved | Pass |
Action details
|
Not available
|
19-1814
| 1 | 1. | | Agreement/Contract | Approval of Change Order No. 2, Contract Number Y17-768, Orange County Corrections Booking and Release Center Energy Recovery Unit Replacement, with AMSCO, in the amount of $18,824.16, for a revised lump sum contract amount of $662,589.56. (Capital Projects Division) | Approved | Pass |
Action details
|
Not available
|
19-1815
| 1 | 2. | | Agreement/Contract | Approval of Change Order No. 3, Contract Number Y17-807, Corrections Campus Wide Boiler System Improvements, with Atkins North America Inc, in the amount of $17,678.16, for a revised lump sum contract amount of $263,589.46. (Capital Projects Division) | Approved | Pass |
Action details
|
Not available
|
19-1816
| 1 | 3. | | Agreement/Contract | Approval of Change Order No. 3, Contract Number Y17-816, Sheriff’s 911 Communication Center Assessment, with Architects Design Group Inc, in the amount of $58,534.02, for a revised lump sum contract amount of $219,211.96. (Capital Projects Division) | Approved | Pass |
Action details
|
Not available
|
19-1817
| 1 | 4. | | Agreement/Contract | Approval of Change Order No. 3, Contract No. Y18-707, Orange County Courthouse Exterior Building Protection Modifications, with Cafe Construction & Development Inc, in the amount of $13,703.92, for a revised lump sum contract amount of $300,373.38. (Capital Projects Division) | Approved | Pass |
Action details
|
Not available
|
19-1818
| 1 | 5. | | Agreement/Contract | Approval of Change Order No. 2, Contract Number Y17-805, Corrections Work Release Center HVAC System & Domestic Water System Replacement, with Atkins North America, in the amount of $18,092.24, for a revised lump sum contract amount of $266,662.37. (Capital Projects Division) | Approved | Pass |
Action details
|
Not available
|
19-1819
| 1 | 6. | | Bid/RFP | Approval to award Invitation for Bids Y19-1050-KB, Communication Materials, to the sole responsive and responsible bidder, Graybar Electric Company, Inc. The estimated contract award amount is $750,000 for a 3-year term. ([Administration and Fiscal Services Information System and Services Division] Procurement Division) | Approved | Pass |
Action details
|
Not available
|
19-1820
| 1 | 7. | | Bid/RFP | Approval to award Invitation for Bids Y19-1092-AH, Liquid Polymer for Eastern Water Reclamation Facility (EWRF), to the low responsive and responsible bidder, Polydyne, Inc. The estimated contract award amount is $586,305 for a 1-year term. ([Utilities Department Water Reclamation Division] Procurement Division) | Approved | Pass |
Action details
|
Not available
|
19-1821
| 1 | 8. | | Bid/RFP | Approval to award Invitation for Bids Y20-128-MV, Laboratory Supplies, to the low responsive and responsible bidder, Thomas Scientific, LLC. The estimated contract award amount is $958,419.65 for a 3-year term. ([Utilities Department Water Division] Procurement Division) | Approved | Pass |
Action details
|
Not available
|
19-1822
| 1 | 9. | | Bid/RFP | Approval to award Invitation for Bids Y20-138-PD, Basketball Officials, to the low responsive and responsible bidder, Silbo, Inc. The estimated annual contract award amount is $134,000 for the base year. ([Community and Family Services Department Parks and Recreation Division] Procurement Division) | Approved | Pass |
Action details
|
Not available
|
19-1823
| 1 | 10. | | Bid/RFP | Approval to award Invitation for Bids Y19-701-CH, Sadler Road & U.S. 441 Intersection Improvements - FPN: 441400-1-58-01 FAN: D518-087-B, to the low responsive and responsible bidder, Atlantic Civil Constructors Corporation. The estimated contract award amount is $362,068.35. ([Public Works Department Engineering Division] Procurement Division) | Approved | Pass |
Action details
|
Not available
|
19-1824
| 1 | 11. | | Bid/RFP | Approval to award Invitation for Bids Y19-772-TA, Town Center (PS 3497) and South Central (PS 3499) Master Pump Station Improvements, to the low responsive and responsible bidder, Intercounty Engineering, Inc. The total contract award amount is $9,719,700. ([Utilities Department Engineering Division] Procurement Division) | Approved | Pass |
Action details
|
Not available
|
19-1825
| 1 | 12. | | Bid/RFP | Approval to award Invitation for Bids Y20-700-TA, South Water Reclamation Facility Influent Pump Station and South Plant Electrical Building Roof Replacements, to the low responsive and responsible bidder, T&G Corporation dba T&G Constructors. The total contract award amount is $600,000. ([Utilities Department Engineering Division] Procurement Division) | Approved | Pass |
Action details
|
Not available
|
19-1826
| 1 | 13. | | Bid/RFP | Approval to award Invitation for Bids Y20-701-RC, Orange County Trimble Park Boat Mooring and Dock Repairs, to the low responsive and responsible bidder, Cloud 9 Services, Inc. dba Fender Marine Construction. The total contract award amount is $198,939 inclusive of alternate No. 1. ([Administrative Services Department Capital Projects Division] Procurement Division) | Approved | Pass |
Action details
|
Not available
|
19-1827
| 1 | 14. | | Bid/RFP | Approval to award Invitation for Bids Y20-706-TA, Western Regional Water Supply Facility Improvements Phase 3A-Part 2, to the low responsive and responsible bidder, Prime Construction Group, Inc. The total contract award amount is $2,049,940. ([Utilities Department Engineering Division] Procurement Division) | Approved | Pass |
Action details
|
Not available
|
19-1828
| 1 | 15. | | Bid/RFP | Approval to award Invitation for Bids Y20-708-RM, John Young Parkway and Conroy Road/Americana Boulevard Texas Avenue and Rio Grande Avenue Intersections and Sidewalk Improvements, to the low responsive and responsible bidder, Stage Door II, Inc. The estimated contract award amount is $696,377.15. ([Public Works Department Engineering Division] Procurement Division) | Approved | Pass |
Action details
|
Not available
|
19-1829
| 1 | 16. | | Bid/RFP | Approval to award Invitation for Bids Y20-710-JS, Waterford Lakes Parkway and Lake Cypress Circle Intersection Improvements, to the low responsive and responsible bidder, Schuller Contractors Incorporated. The total contract award amount is $193,323. ([Public Works Department Engineering Division] Procurement Division) | Approved | Pass |
Action details
|
Not available
|
19-1830
| 1 | 17. | | Agreement/Contract | Approval of Amendment No. 6, Contract Y16-1042-MG, Electronic Patient Care Report System, with ImageTrend, in the amount of $39,700, for a revised total contract amount of $756,286.03. ([Fire Rescue Department Operations Division] Procurement Division) | Approved | Pass |
Action details
|
Not available
|
19-1831
| 1 | 18. | | Agreement/Contract | Approval of Amendment No. 6, Contract Y16-1082A-MR, Tree Trimming and Related Services - Roads and Drainage Division, with The Davey Tree Expert Company, in the amount of $350,000, for a revised total contract amount of $1,962,540.71. ([Public Works Department Roads and Drainage Division] Procurement Division) | Approved | Pass |
Action details
|
Not available
|
19-1832
| 1 | 19. | | Agreement/Contract | Approval of Amendment No. 6, Contract Y17-137, Uniforms for Fire Rescue Department, with Designlab, Inc., in the amount of $70,000, for a revised total contract amount of $732,029.70. ([Fire Rescue Department Infrastructure and Support Division] Procurement Division) | Approved | Pass |
Action details
|
Not available
|
19-1833
| 1 | 20. | | Agreement/Contract | Approval of Amendment No. 6, Contract Y18-163E, Countywide Janitorial Services - West District Buildings, with Florida Cleaning Systems, Inc., in the amount of $13,509.60, for a revised estimated contract amount of $623,417.63. ([Administrative Services Department Facilities Management Division] Procurement Division) | Approved | Pass |
Action details
|
Not available
|
19-1834
| 1 | 21. | | Budget/Funding | Approval of Purchase Order M98684, Commercial/Industrial Underground Distribution Electrical Service, with Duke Energy, in the amount of $118,794.28. ([Utilities Department Engineering Division] Procurement Division) | Approved | Pass |
Action details
|
Not available
|
19-1835
| 1 | 22. | | Budget/Funding | Ratification of PO M98910, Annual Maintenance, Equipment and Technician Services for the E911 Positron Viper System, with AT&T, in the estimated annual amount of $894,373.44. ([Administration and Fiscal Services Information Systems and Services Division] Procurement Division) | Approved | Pass |
Action details
|
Not available
|
19-1836
| 1 | 23. | | Agreement/Contract | Approval and execution of Second Amendment to Orlando United Assistance Center License Agreement by and between Orange County, Florida and Heart of Florida United Way, Inc. and delegation of authority to the Real Estate Management Division to furnish notices required or allowed by the license, as needed for Orlando United Assistance Center 507 East Michigan Street, Orlando, Florida 32806 Lease File #8002. District 3. (Real Estate Management Division) | Approved | Pass |
Action details
|
Not available
|
19-1837
| 1 | 24. | | Agreement/Contract | Approval and execution of License Agreement by and between Orange County, Florida and Bay Area Youth Services, Inc. and delegation of authority to the Real Estate Management Division to exercise renewal options, approve holdover, execute termination notice, and furnish notices, required or allowed by the license, as needed for Bays Florida - JAC 823 West Central Boulevard, Orlando, Florida 32805 Lease File #10080. District 6. (Real Estate Management Division) | Approved | Pass |
Action details
|
Not available
|
19-1838
| 1 | 25. | | Agreement/Contract | Approval and execution of First Amendment to Lease Agreement by and between Pyramid Properties II, LLP and Orange County, Florida and delegation of authority to the Real Estate Management Division to exercise renewal options, furnish notices, and execute tenant estoppel certificates, required or allowed by the lease, as needed for Parkway Center II 4790 North Orange Blossom Trail, Orlando, Florida 32810 Lease File #1017B. District 2. (Real Estate Management Division) | Approved | Pass |
Action details
|
Not available
|
19-1839
| 1 | 26. | | Agreement/Contract | Approval and execution of Fourth Amendment to Lease Agreement by and between Pyramid Properties III, LLP f/k/a Pyramid Properties III and Orange County, Florida and delegation of authority to the Real Estate Management Division to exercise renewal options, execute tenant estoppel certificates, coordinate improvement projects, and furnish notices, required or allowed by the lease, as needed for Parkway Center III 4548 Parkbreeze Court, Orlando, Florida 32808 Lease File #2015. District 2. (Real Estate Management Division) | Approved | Pass |
Action details
|
Not available
|
19-1840
| 1 | 27. | | Agreement/Contract | Approval and execution of Fifth Amendment to Lease Agreement by and between Pyramid Properties VI, LLP f/k/a Pyramid Properties VI and Orange County, Florida and delegation of authority to the Real Estate Management Division to exercise renewal options, execute tenant estoppel certificates, and furnish notices, required or allowed by the lease, as needed for Parkway Center VI 3511, 3517, and 3521 Parkway Center Court, Orlando, Florida 32808 Lease File #1017. District 2. (Real Estate Management Division) | Approved | Pass |
Action details
|
Not available
|
19-1841
| 1 | 28. | | Agreement/Contract | Approval and execution of Sublease Agreement between the University of Central Florida Board of Trustees and Orange County, Florida and delegation of authority to the Real Estate Management Division to furnish notices, required or allowed by the sublease, as needed for Lake Ellenor Sublease from UCF 7300 Lake Ellenor Drive, Orlando, Florida 32809 Lease File #8008. District 6. (Real Estate Management Division) | Approved | Pass |
Action details
|
Not available
|
19-1842
| 1 | 29. | | Agreement/Contract | Approval and execution of Right of Entry between Orange County, Florida, City of Orlando, and Orange County Library District for Horizon West Library Site. District 1. (Real Estate Management Division) | Approved | Pass |
Action details
|
Not available
|
19-1843
| 1 | 30. | | Resolution | Approval and execution of Resolution (Parcels 1006/7006) and authorization to initiate condemnation proceedings for Kennedy Boulevard (Forest City Road to Wymore Road). District 2. (Real Estate Management Division) | Approved | Pass |
Action details
|
Not available
|
19-1844
| 1 | 31. | | Agreement/Contract | Approval and execution of Utility Easement between The School Board of Orange County, Florida and Orange County, Florida and authorization to record instrument for OCPS School Site 49-E-W-4 (Water Spring Elementary School) #96865. District 1. (Real Estate Management Division) | Approved | Pass |
Action details
|
Not available
|
19-1845
| 1 | 32. | | Agreement/Contract | Approval of Agreement for Sale and Purchase and Special Warranty Deed between Wadsworth Street LLC and Orange County, Florida, delegation of authority to the Manager of the Real Estate Management Division to exercise all delegations of authority expressly provided for by the Agreement for Sale and Purchase, and authorization to disburse funds to pay purchase price and perform all actions necessary and incidental to closing for 2534 33rd Street (I-Hop). District 6. (Real Estate Management Division) | Approved | Pass |
Action details
|
Not available
|
19-1846
| 1 | 33. | | Agreement/Contract | Approval of Contract for Sale and Purchase and Warranty Deed between Lo Bros Enterprises, Inc. and Orange County and authorization to disburse funds to pay purchase price and closing costs and perform all actions necessary and incidental to closing for Magnolia Park Expansion. District 2. (Real Estate Management Division) | Approved | Pass |
Action details
|
Not available
|
19-1847
| 1 | 34. | | Agreement/Contract | Approval of Purchase Agreement and Utility Easement between McCoy Federal Credit Union and Orange County and authorization to disburse funds to pay purchase price and recording fees and record instrument for Pump Station 3249 (Orange Wood Service Center). District 4. (Real Estate Management Division) | Approved | Pass |
Action details
|
Not available
|
19-1848
| 1 | 35. | | Agreement/Contract | Approval of Warranty Deed from The Oasis at Moss Park Preserve, LLC to Orange County and authorization to perform all actions necessary and incidental to closing for Moss Park Preserve. District 4. (Real Estate Management Division) | Approved | Pass |
Action details
|
Not available
|
19-1849
| 1 | 1. | | Application/License | Approval and execution of Florida Department of Children and Families Application for a License to Operate a Child Care Facility at Bithlo Head Start. This application is only executed by Orange County. (Head Start Division) | Approved | Pass |
Action details
|
Not available
|
19-1850
| 1 | 2. | | Application/License | Approval and execution of Florida Department of Children and Families Application for a License to Operate a Child Care Facility at Hal P. Marston Head Start. This application is only executed by Orange County. (Head Start Division) | Approved | Pass |
Action details
|
Not available
|
19-1851
| 1 | 3. | | Application/License | Approval and execution of Florida Department of Children and Families Application for a License to Operate a Child Care Facility at Pine Hills Head Start. This application is only executed by Orange County. (Head Start Division) | Approved | Pass |
Action details
|
Not available
|
19-1852
| 1 | 1. | | Appointment | Concurrence with the State Surgeon General’s appointment of Dr. Raul Pino to the position of Administrator of the Florida Department of Health in Orange County. | Approved | Pass |
Action details
|
Not available
|
19-1853
| 1 | 2. | | Agreement/Contract | Approval and execution of Extension Agreement between Orange County, Florida and the Orange County Sheriff’s Office regarding the Subrecipient Agreement related to the US Department of Justice, Office of Justice Programs, Bureau of Justice Assistance Edward Byrne Memorial Justice Assistance Grant Award 2016-DJ-BX-0153 and authorization for the Mayor or designee to execute an agreement with the Orange County Sheriff’s Office that is substantially consistent with the approved extension and amendment terms. (Office for a Drug Free Community) | Approved | Pass |
Action details
|
Not available
|
19-1854
| 1 | 1. | | Resolution | Approval and execution of Orange County, Florida, Resolutions Establishing Special Assessment Liens for Lot Cleaning Services and approval to record Special Assessment Liens on property cleaned by Orange County, pursuant to Orange County Code, Chapter 28, Nuisances, Article II, Lot Cleaning. All Districts. (Code Enforcement Division)
LC 19-0944 LC 19-1095 LC 19-1083 LC 19-1069 LC 19-1050
LC 19-1097 LC 20-0006 LC 19-1084 LC 19-1110 LC 19-1076
LC 19-0797 LC 20-0008 LC 19-1122 LC 19-1124 LC 19-1077
LC 19-0893 LC 20-0039 LC 19-0937 LC 19-1125 LC 19-1079
LC 19-0915 LC 19-0872 LC 19-1029 LC 19-0858 LC 19-1101
LC 19-1043 LC 19-1032 LC 19-1063 LC 19-0988 LC 19-1103
LC 19-1089 LC 19-1057 LC 19-1059 LC 19-1001 LC 19-1119
LC 19-1091 LC 19-1082 LC 19-1060 LC 19-1016 LC 19-1128 | Approved | Pass |
Action details
|
Not available
|
19-1855
| 1 | 2. | | Recommendation | Acceptance of the findings and recommendation of Environmental Protection Division staff to approve the request for Conservation Area Impact Permit Modification No. CAI-14-08-025 for the Shoppes at Alafaya Project Site. District 4. (Environmental Protection Division) | | |
Action details
|
Not available
|
19-1856
| 1 | 3. | | Recommendation | Make a finding that the variance request is consistent with Orange County Code, Chapter 15, Article IX, Section 15-350(a)(1) and a finding that the waiver requests are consistent with Section 15-350(a)(2) and accept the recommendation and findings of the Environmental Protection Commission to approve the requests for variance to Section 15-342(a) (water depth) and waivers to Section 15-343(b) (side setback) and Section 15-342(b) (terminal platform size) with the condition that the applicant pay $725 to the Conservation Trust Fund within 60 days of the decision of the Board of County Commissioners for the Anamaria Veiga Dock Construction Permit BD-19-04-036. District 1. (Environmental Protection Division) | Approved | Pass |
Action details
|
Not available
|
19-1857
| 1 | 4. | | Recommendation | Make a finding that the waiver requests are consistent with Orange County Code, Chapter 15, Article IX, Section 15-350(a)(2) and accept the recommendation and findings of the Environmental Protection Commission to approve the request for waivers to Article IX, Section 15-343(b) (side setback distance) and Section 15-342(b) (terminal platform size) with the condition that the applicant pay $725 to the Conservation Trust Fund within 60 days of the decision of the Board of County Commissioners for the Ross Astrup Dock Construction Permit BD-19-04-033. District 1. (Environmental Protection Division) | Approved | Pass |
Action details
|
Not available
|
19-1858
| 1 | 5. | | Recommendation | Make a finding that the waiver request is consistent with Orange County Code, Chapter 15, Article IX, Section 15-350(a)(2) and accept the recommendation and findings of the Environmental Protection Commission to approve the request for waiver to Section 15-342(b) (terminal platform size) to increase the terminal platform size by 140 square feet to a total of 640 square feet with the condition that the applicant pay $493 to the Conservation Trust Fund within 60 days of the decision of the Board of County Commissioners for the Delaney Park Investments, LLC Dock Construction Permit BD 19-08-076. District 3. (Environmental Protection Division) | Approved | Pass |
Action details
|
Not available
|
19-1859
| 1 | 6. | | Recommendation | Make a finding that the waiver request is consistent with Orange County Code, Chapter 15, Article IX, Section 15-350(a)(2) and accept the recommendation and findings of the Environmental Protection Commission to approve the request for waiver to Section 15-342(b) (terminal platform size) to increase the terminal platform size by 29 square feet to a total of 929 square feet with the condition that the applicant pay $609 to the Conservation Trust Fund within 60 days of the decision of the Board of County Commissioners for the Todd Weiden Dock Construction Permit BD 19-08-086. District 1. (Environmental Protection Division) | Approved | Pass |
Action details
|
Not available
|
19-1860
| 1 | 7. | | Agreement/Contract | Approval and execution of Project Administration Subrecipient Agreements between Orange County, Florida and public service agencies regarding the Community Development Block Grant Program and Emergency Solutions Grant Program FY 2019-2020. All Districts. (Housing and Community Development Division) | Approved | Pass |
Action details
|
Not available
|
19-1861
| 1 | 8. | | Agreement/Contract | Approval and execution of Proportionate Share Agreement for Focal Point Church John Young Parkway by and between Hunter’s Creek Community Church, Inc. and Orange County for a proportionate share payment in the amount of $82,583. District 1. (Roadway Agreement Committee) | Approved | Pass |
Action details
|
Not available
|
19-1862
| 1 | 9. | | Agreement/Contract | Approval and execution of Proportionate Share Agreement for LA Fitness - Winter Park University Aloma Avenue by and between Silver City Cinemas, LLC and Orange County for a proportionate share payment in the amount of $232,537. District 5. (Roadway Agreement Committee) | Approved | Pass |
Action details
|
Not available
|
19-1863
| 1 | 10. | | Agreement/Contract | Approval and execution of Proportionate Share Agreement for McDonald's at Hamlin Avalon Road/CR 545 by and between Hamlin Retail Partners, LLC and Orange County directing both the proportionate share payment in the amount of $24,128 and future transportation impact fees that may be associated with the project pursuant to the Escrow Agreement for the Hamlin West Amended and Restated Road Network Agreement be utilized towards the completion of Avalon Road/CR 545 improvements. District 1. (Roadway Agreement Committee) | Approved | Pass |
Action details
|
Not available
|
19-1864
| 1 | 11. | | Agreement/Contract | Approval and execution of Proportionate Share Agreement for Taco Bell at South Orange Blossom Trail Orange Blossom Trail: from Taft-Vineland Road to Landstreet Road by and between VRE OBT, LLC and Orange County for a proportionate share payment in the amount of $107,108. District 4. (Roadway Agreement Committee) | Approved | Pass |
Action details
|
Not available
|
19-1865
| 1 | 1. | | Recommendation | Approval of Traffic Control Devices in Waterleigh Phases 3B, 3C, and 3D. District 1. (Traffic Engineering Division) | Approved | Pass |
Action details
|
Not available
|
19-1866
| 1 | 2. | | Recommendation | Approval of Traffic Control Devices and "No Parking" signs installation in Waterleigh Phase 3A. District 1. (Traffic Engineering Division) | Approved | Pass |
Action details
|
Not available
|
19-1867
| 1 | 3. | | Recommendation | Approval of Traffic Control Devices and "No Parking" signs installation in Enclave at Hamlin. District 1. (Traffic Engineering Division) | Approved | Pass |
Action details
|
Not available
|
19-1868
| 1 | 4. | | Recommendation | Approval of “No Parking” signs installation on Citruswood Drive within the Enclave at Moss Park Community. District 4. (Traffic Engineering Division) | Approved | Pass |
Action details
|
Not available
|
19-1869
| 1 | 5. | | Recommendation | Approval to remove “No Parking” signs on Lake Abbots Drive from Twilight Bay Drive to Spring Park Drive. District 1. (Traffic Engineering Division) | Approved | Pass |
Action details
|
Not available
|
19-1870
| 1 | 6. | | Agreement/Contract | Approval and execution of (1) Locally Funded Agreement between the State of Florida Department of Transportation and Orange County Financial Management No.: 412994-8-82-43 for railroad improvements at Landstreet Road grade crossing and (2) Financial Management Number 412994-8-82-43 Resolution 2019-M-48 of the Orange County Board of County Commissioners regarding the Locally Funded Agreement with the State of Florida Department of Transportation concerning certain railroad improvements at Landstreet Road grade crossing (A797.60). District 4. (Traffic Engineering Division) | Approved | Pass |
Action details
|
Not available
|
19-1871
| 1 | 7. | | Agreement/Contract | Approval and execution of Memorandum of Understanding for design and construction related to the proposed traffic signal at Universal Boulevard & Perimeter Road Between Orange County Public Works Department And Lockheed Martin Corporation. District 6. (Traffic Engineering Division) | Approved | Pass |
Action details
|
Not available
|
19-1872
| 1 | 8. | | Agreement/Contract | Approval of State of Florida Department of Transportation Contract Renewal Contract No.: AS278 Financial Project No(s).: 426022-1-78-03 by and between the State of Florida Department of Transportation and Orange County to extend the period of the contract to January 8, 2023. District 1. | Approved | Pass |
Action details
|
Not available
|
19-1873
| 1 | 1. | | Agreement/Contract | Approval and execution of First Amendment to Recycling Partnership Grant Agreement by and between The Recycling Partnership, Inc. and Orange County, Florida to reduce grant amount from $193,000 to $180,000 and extend the grant term to March 31, 2020. All Districts. (Solid Waste Division) | Approved | Pass |
Action details
|
Not available
|
19-1874
| 1 | 2. | | Agreement/Contract | Approval and execution of HC Transport Water and Wastewater Flow Monitoring Agreement by and between HC Transport, Inc. and Orange County for an initial 10-year period to monitor water usage and wastewater discharges from the facility. District 2. (Engineering Division) | Approved | Pass |
Action details
|
Not available
|
19-1875
| 1 | 1. | | Record/Minutes | Receipt of the following items file for the record. (Clerk's Office)
a. City of Orlando Voluntary Annexation Request - 6601 and 6609 Hoffner Avenue - ANX2019-10006. Proposed Ordinance #2019-53, entitled an Ordinance of the City Council of the City of Orlando, Florida, annexing to the corporal limits of the City certain property generally located north of Hoffner Avenue, south of Van Road, and west of Volusia Drive, and comprised of 1.105 acres of land, more or less, and amending the City's boundary description; amending the City's adopted Growth Management Plan to designate the property as Office Low Intensity on the City's Official Future Land Use Maps; designating the property as the Office and Residential District with the Aircraft Noise Overlay District (O-1/AN) on the City's official zoning maps; providing for amendment of the City's official Future Land Use and zoning maps; providing for severability, correction of scrivener's errors, permit disclaimer, and an effective date.
b. City of Orlando Ordinance No. 2019-47, adopted by City Council on October 21, 2019. Ordinance No. | Received and Filed | |
Action details
|
Not available
|
19-1876
| 1 | 1. | | Bid/RFP | Selection of three firms and two ranked alternates to provide Staff Augmentation for Information Systems and Services, Request for Proposals Y19-1038-TJ, from the following eight firms, listed alphabetically:
- A.B. Closing Corporation dba Kavaliro
- Allegis Group Holdings, Inc. dba TEK Systems, Inc.
- Cogent Infotech Corporation
- OST, Inc.
- SDTR Consulting, LLC
- SoftHQ, Inc.
- Software Resources, Inc.
- Visium Resources, Inc.
([Administration and Fiscal Services Information Systems and Services Division] Procurement Division) | Approved | Pass |
Action details
|
Video
|
19-1877
| 1 | 1. | | Report/Update | Open discussion on issues of interest to the Board. | No Action | |
Action details
|
Video
|
19-1878
| 1 | 1. | | Presentation | Public Boat Ramps. (Parks and Recreation Division) | No Action | |
Action details
|
Not available
|
19-1879
| 1 | 1. | | Presentation | Expanded Polystyrene/Plastic Straw Policy. (Planning Division) | No Action | |
Action details
|
Video
|
19-1880
| 1 | 1. | | Recommendation | November 7, 2019 Board of Zoning Adjustment Recommendations | Approved | Pass |
Action details
|
Video
|
19-1622
| 1 | 1. | | Public Hearing | Municipal Service Taxing Unit
Asbury Park 1st Addition Canal, terminate for aquatic weed control and general maintenance and improvement; District 2 | Approved | Pass |
Action details
|
Video
|
19-1625
| 1 | 2. | | Public Hearing | Municipal Service Taxing Unit
Lake Lawne, terminate for aquatic weed control and general maintenance and improvement: District 6 | Approved | Pass |
Action details
|
Video
|
19-1626
| 1 | 3. | | Public Hearing | Municipal Service Taxing Unit
Lake Waumpi, terminate for aquatic weed control and general maintenance and improvement; District 5 | Approved | Pass |
Action details
|
Video
|
19-1627
| 1 | 4. | | Public Hearing | Petition to Vacate
Christopher Wrenn, on behalf of D.R. Horton, Inc., Petition to Vacate 19-05-021; vacate a portion of an unopened, unimproved right-of-way; District 1 | Adopted | Pass |
Action details
|
Video
|
19-1498
| 1 | 5. | | Public Hearing | Board of Zoning Adjustment Board-Called
Florida Engineering Group, Inc., Case # SE-19-09-105, September 5, 2019; District 5 (Continued from November 12, 2109) | Approved | Pass |
Action details
|
Video
|
19-1442
| 1 | 6. | | Public Hearing | Planning and Zoning Commission Rezoning Board-Called
Ossama Salama, Sam’s Towing, Inc., Case # RZ-19-04-003; August 15, 2019; District 5 (Continued from October 22, 2019) | Approved | Pass |
Action details
|
Video
|
19-1555
| 1 | 7. | | Public Hearing | Preliminary Subdivision Plan
Ashraf Masoud, Dreams Company for Trading & Construction USA, Inc., Mary Creek at Goldenrod Preliminary Subdivision Plan, Case # PSP-18-02-061; District 3 | Approved | Pass |
Action details
|
Video
|
19-1556
| 1 | 8. | | Public Hearing | Preliminary Subdivision Plan
Adam Smith, VHB, Inc., Waterleigh Planned Development / Phase 4 Preliminary Subdivision Plan, Case # PSP-18-10-339; District 1 | Approved | Pass |
Action details
|
Video
|
19-1628
| 1 | 9. | | Public Hearing | Preliminary Subdivision Plan
Limaris Ramos, Primera Construction Corporation, Eagles Landing Preliminary Subdivision Plan, Case # PSP-18-10-321; District 3 | Approved | Pass |
Action details
|
Video
|
19-1554
| 1 | 10. | | Public Hearing | Substantial Change
Kathy Hattaway, Poulos & Bennett, LLC, Meadow Woods Planned Development / Land Use Plan (PD/LUP), Case # CDR-19-08-265, amend plan; District 4 | Approved | Pass |
Action details
|
Video
|
19-1623
| 1 | 11. | | Public Hearing | Substantial Change
Constance Silver, Tri3 Civil Engineering Design Studio, Inc., Buena Vista Commons Planned Development / Land Use Plan (PD/LUP), Case # CDR-19-06-191, amend plan; District 1 | Approved | Pass |
Action details
|
Video
|
19-1624
| 1 | 12. | | Public Hearing | Substantial Change
Eric Warren, Poulos & Bennett, LLC, Village F Master Planned Development / Horizon West Village F Parcels S-7, S-15, S-16, S-17, S-18, S-19, & S-20 Preliminary Subdivision Plan, Case # CDR-19-09-306, amend plan; District 1 | Approved | Pass |
Action details
|
Video
|
19-1436
| 1 | 13. | | Public Hearing | Substantial Change
Brooks Stickler, Kimley-Horn and Associates, Inc., Alafaya Trail Property Planned Development / Land Use Plan (PD / LUP), Case # CDR-14-05-144, amend plan; District 4 (Continued from October 22, 2019, December 3, and 17, 2019) | Continued | Pass |
Action details
|
Video
|
19-1855
| 1 | 2. | | Recommendation | Acceptance of the findings and recommendation of Environmental Protection Division staff to approve the request for Conservation Area Impact Permit Modification No. CAI-14-08-025 for the Shoppes at Alafaya Project Site. District 4. (Environmental Protection Division) | Continued | |
Action details
|
Not available
|
19-1443
| 1 | 14. | | Public Hearing | Substantial Change
William Burkett, Burkett Engineering, The Glenn Planned Development / Land Use Plan (PD / LUP) - Case # CDR-19-03-115, amend plan; District 5 (Continued from October 22, 2019) | Approved | Pass |
Action details
|
Video
|
19-1490
| 1 | 15. | | Public Hearing | Rezoning
Chris Dougherty, S&ME, Inc., Wise Colonial PD, Case # LUP-19-03-088; District 5 (Continued from November 12, 2019) | Approved | Pass |
Action details
|
Video
|
19-1668
| 1 | 16. | | Public Hearing | Agreement
Joint Planning Area Agreement between Orange County and City of Ocoee; District 2 | Approved | Pass |
Action details
|
Video
|
19-1640
| 1 | 17. | | Public Hearing | Amending Orange County Code, adopting 2019-2 Small Scale Development Amendments to the 2010-2030 Comprehensive Plan (CP) and where applicable concurrent rezoning requests and Adoption of Ordinance
Small-Scale Development Privately-Initiated Comprehensive Plan Amendment
Amendment 2019-2-S-1-1
Robert Reese, Brossier Corp., for Vurnell Vandever; District 1 | Adopted | Pass |
Action details
|
Video
|
19-1641
| 1 | 17. | | Public Hearing | Small-Scale Development Privately-Initiated Comprehensive Plan
Amendment
Amendment 2019-2-S-2-1
Clifton McFadden for Vincent Contestabile and Empire Tire of Edgewater,
LLC; District 2 | Adopted | Pass |
Action details
|
Video
|
19-1642
| 1 | 17. | | Public Hearing | Ordinance/Comprehensive Plan
Amending Orange County Code, adopting 2019-2 Small Scale Development Amendments to the 2010-2030 Comprehensive Plan (CP) and Adoption of Ordinance (Continued from December 3, 2019, January 14, and March 10, 2020) (CANCELED)
Small-Scale Development Privately-Initiated Comprehensive Plan Amendment
Amendment 2019-2-S-2-2
Mario Golden for Deborah Postell
Medium Density Residential (MDR) to Medium-High Density Residential | Continued | Pass |
Action details
|
Video
|
19-1643
| 1 | 17. | | Public Hearing | Small-Scale Development Privately-Initiated Comprehensive Plan Amendment
Amendment 2019-2-S-2-3
Quang Lam for Toolsie Persaud USA, LLC and Batrina Properties, Inc.; District 2 | Denied | Pass |
Action details
|
Video
|
19-1644
| 1 | 17. | | Public Hearing | Concurrent Rezoning Request
Quang Lam for Toolsie Persaud USA, LLC and Batrina Properties, Inc.
Rezoning RZ-19-10-031 | No Action | |
Action details
|
Not available
|
19-1645
| 1 | 17. | | Public Hearing | Small-Scale Development Privately-Initiated Comprehensive Plan Amendment
Amendment 2019-2-S-2-4
Jean M. Abi-Aoun for Lake Warehouse and Storage Tangerine, LLC; District 2 | Withdrawn | |
Action details
|
Not available
|
19-1646
| 1 | 17. | | Public Hearing | Concurrent Rezoning Request
Jean M. Abi-Aoun for Lake Warehouse and Storage Tangerine, LLC
Rezoning RZ-19-10-032 | Withdrawn | |
Action details
|
Not available
|
19-1647
| 1 | 17. | | Public Hearing | Ordinance/Comprehensive Plan
Amending Orange County Code, adopting 2019-2 Small Scale Development Amendments to the 2010-2030 Comprehensive Plan (CP) and where applicable concurrent rezoning requests and Adoption of Ordinance (Continued from December 3, 2019 and January 14, 2020)
Small-Scale Development Privately-Initiated Comprehensive Plan Amendment
Amendment 2019-2-S-2-5
Tom Sullivan for ECP Grassmere, LLC; District 2 | Continued | Pass |
Action details
|
Video
|
19-1648
| 1 | 17. | | Public Hearing | Small-Scale Development Privately-Initiated Comprehensive Plan Amendment
Amendment 2019-2-S-2-6 (fka 2019-1-S-2-1)
Kenneth Patterson, design solutionsfl., inc., for George Dillon; District 2 | Denied | Pass |
Action details
|
Video
|
19-1649
| 1 | 17. | | Public Hearing | Small-Scale Development Privately-Initiated Comprehensive Plan Amendment
Amendment 2019-2-S-3-1
Tuan Tran for Linh Pham; District 3 | Denied | Pass |
Action details
|
Video
|
19-1651
| 1 | 17. | | Public Hearing | Concurrent Rezoning Request
Tuan Tran for Linh Pham
Rezoning RZ-19-10-018 | No Action | |
Action details
|
Not available
|
19-1652
| 1 | 17. | | Public Hearing | Small-Scale Development Privately-Initiated Comprehensive Plan Amendment
Amendment 2019-2-S-3-2
Rony Charles for Makandal Property Investments; District 3 | Denied | Pass |
Action details
|
Video
|
19-1653
| 1 | 17. | | Public Hearing | Concurrent Rezoning Request
Rony Charles for Makandal Property Investments
Rezoning RZ-19-10-029 | No Action | |
Action details
|
Not available
|
19-1654
| 1 | 17. | | Public Hearing | Small-Scale Development Privately-Initiated Comprehensive Plan Amendment
Amendment 2019-2-S-3-3
Rebecca Wilson, Lowndes, Drosdick, Doster, Kantor & Reed, P.A., for East West Place LLC, Giovanni Fernandez ; District 3 | Adopted | Pass |
Action details
|
Video
|
19-1655
| 1 | 17. | | Public Hearing | Concurrent Rezoning Request
Rebecca Wilson, Lowndes, Drosdick, Doster, Kantor & Reed, P.A., for East West Place LLC, Giovanni Fernandez
Rezoning RZ-19-10-049 | Approved | Pass |
Action details
|
Video
|
19-1656
| 1 | 17. | | Public Hearing | Small-Scale Development Privately-Initiated Comprehensive Plan Amendment
Amendment 2019-2-S-3-4
Maximo Reyes Arias for Maximo Reyes Arias and Viviana Estela Salvador Fernandez; District 3 | Denied | Pass |
Action details
|
Video
|
19-1657
| 1 | 17. | | Public Hearing | Concurrent Rezoning Request
Maximo Reyes Arias for Maximo Reyes Arias and Viviana Estela Salvador Fernandez
Rezoning RZ-19-10-028 | Denied | Pass |
Action details
|
Video
|
19-1658
| 1 | 17. | | Public Hearing | Small-Scale Development Privately-Initiated Comprehensive Plan Amendment
Amendment 2019-2-S-4-1
Brooks A. Stickler, P.E., Kimley-Horn and Associates, Inc., for Judith S. Burton; District 4 | Adopted | Pass |
Action details
|
Video
|
19-1659
| 1 | 17. | | Public Hearing | Small-Scale Development Privately-Initiated Comprehensive Plan Amendment
Amendment 2019-2-S-5-1
Neel Shivcharran, Galleon Consulting Group, LLC for 5565 Old Cheney, LLC
Low-Medium Density Residential (LMDR) to Medium Density Residential (MDR) and Commercial (C); District 5 | Continued | Pass |
Action details
|
Video
|
19-1660
| 1 | 17. | | Public Hearing | Ordinance/Comprehensive Plan
Amending Orange County Code, adopting 2019-2 Small Scale Development Amendments to the 2010-2030 Comprehensive Plan (CP) and where applicable concurrent rezoning request and Adoption of Ordinance (Continued from December 3, 2019)
Small-Scale Development Privately-Initiated Comprehensive Plan Amendment
Amendment 2019-2-S-5-2
Craig Cooke for Wedgefield Golf and Restaurant LLC, Craig Cooke; District 5 | Continued | Pass |
Action details
|
Video
|
19-1661
| 1 | 17. | | Public Hearing | Concurrent Rezoning Request
Rezoning RZ-19-10-030
Craig Cooke for Wedgefield Golf and Restaurant LLC, Craig Cooke | No Action | |
Action details
|
Not available
|
19-1662
| 1 | 17. | | Public Hearing | Small-Scale Development Privately-Initiated Comprehensive Plan Amendment
Amendment 2019-2-S-5-3
Epoch Properties, Inc., for Aloma United Methodist Church, Inc.; District 5 | Adopted | Pass |
Action details
|
Video
|
19-1663
| 1 | 17. | | Public Hearing | Concurrent Rezoning Request
Epoch Properties, Inc., for Aloma United Methodist Church, Inc.
Rezoning LUP-19-07-236 | Approved | Pass |
Action details
|
Video
|
19-1664
| 1 | 17. | | Public Hearing | Small-Scale Development Privately-Initiated Comprehensive Plan Amendment
Amendment 2019-2-S-5-4
Tom Sullivan for Winter Park Prime Properties, LLC | Continued | Pass |
Action details
|
Video
|
19-1665
| 1 | 17. | | Public Hearing | Concurrent Rezoning Request
Tom Sullivan for Winter Park Prime Properties, LLC
Rezoning RZ-19-10-041 | No Action | |
Action details
|
Not available
|
19-1666
| 1 | 17. | | Public Hearing | Amending Orange County Code, adopting 2019-2 Small Scale Development Amendments to the 2010-2030 Comprehensive Plan (CP) and where applicable concurrent rezoning request and Adoption of Ordinance (Continued from December 3, 2019)
Small-Scale Development Privately-Initiated Comprehensive Plan Amendment
Amendment 2019-2-S-6-1
Al Tehrani, P.E., Tehrani Consulting Engineering, for Powder Coating Factory, LLC; District 6 | Continued | Pass |
Action details
|
Video
|
19-1670
| 1 | 17. | | Public Hearing | Concurrent Rezoning Request
Rezoning RZ-19-10-024
Al Tehrani, P.E., Tehrani Consulting Engineering, for Powder Coating Factory, LLC | No Action | |
Action details
|
Not available
|
19-1671
| 1 | 17. | | Public Hearing | Small-Scale Development Privately-Initiated Comprehensive Plan Amendment
Amendment 2019-2-S-6-2
Dianand Persaud for Persaud Brothers Holding, LLC; District 6 | Continued | Pass |
Action details
|
Video
|
19-1672
| 1 | 17. | | Public Hearing | Small-Scale Development Privately-Initiated Comprehensive Plan Amendment
Amendment 2019-2-S-6-4
Scott Glass and George Dennison, Shutts & Bowen LLP, for Colonial Storage Holdings, LLC; District 6 | Continued | Pass |
Action details
|
Video
|
19-1673
| 1 | 17. | | Public Hearing | Concurrent Rezoning Request
Rezoning RZ-19-10-043
Scott Glass and George Dennison, Shutts & Bowen LLP, for Colonial Storage Holdings, LLC | No Action | |
Action details
|
Not available
|
19-1674
| 1 | 17. | | Public Hearing | Small Scale Staff-Initiated Text Amendment
Amendment 2019-2-S-FLUE-1
Text amendment to Future Land Use Element Policy FLU8.1.4 establishing the maximum densities and intensities for proposed Planned
Developments within Orange County; Countywide | Adopted | Pass |
Action details
|
Video
|
19-1675
| 1 | 17. | | Public Hearing | Small Scale Staff-Initiated Text Amendment
Amendment 2019-2-S-FLUE-2
Text amendment to Future Land Use Element Policy FLU1.2.4 regarding allocation of additional lands to the Urban Service Area (USA); Countywide | Adopted | Pass |
Action details
|
Video
|
19-1676
| 1 | 17. | | Public Hearing | Small Scale Development Amendments Ordinance
Amending Orange County Code, adopting 2019-2 Regular Cycle Amendments to the 2010-2030 Comprehensive Plan (CP), adopting amendments pursuant to Section 163.3187, F.S. | Adopted | Pass |
Action details
|
Video
|